Union Station Rail Corridor

Rail Corridor Upgrade: Condor™ Innovation

The Transit Union Station Rail Corridor project in Toronto, valued at $1,684,820, featured the design, construction, installation, testing, and commissioning of advanced Condor™ products. This included 36 hot air blower snow-clearing devices, baffled steel tie ducts, and an interconnecting ducting system to enhance rail corridor efficiency and winter performance.

Union Station Rail Corridor