Distribution Terminal Expansion

Distribution Terminal Expansion: Track Construction

The Distribution Terminal Expansion project in Vancouver, BC, valued at $13,000,000, included the construction of 36,500 track feet of concrete tie track. The project also featured 900+ subcontracted flashbutt welds and the installation of 9 #8 turnouts and 6 #10 turnouts on both concrete and wood ties. Additionally, powered switch stands were installed on lead turnouts, and friction modifiers and lubricators were supplied to ensure smoother operations and reduce wear.