Track Construction & Upgrades
The Distribution Terminal Expansion project in Vancouver, BC, valued at $350,000, focused on enhancing rail infrastructure. Key deliverables included the removal of a righthand crossover, installation of a lefthand crossover, construction of 300 track feet of new track, and installation of 2 new 115 lbs. RBM yard #8 turnouts. Additionally, a Direct Fixation (DF) system was installed inside the shed near the pit to support operational efficiency.
